Top 8 Causes of Delays in Commercial Construction Projects

Delays in commercial construction aren’t just frustrating—they’re expensive. Schedule overruns impact project financing, tenant commitments, and labor costs. While some delays are unavoidable, many stem from predictable issues that can be mitigated with proper planning, coordination, and experienced sitework.

This article outlines the eight most common causes of commercial construction delays—and how experienced teams help developers avoid them.

  1. Unexpected Site Conditions

Conditions below the surface are a major source of early project delays.

  • Unexpected soil types, groundwater, buried debris, or undocumented utilities can halt excavation and foundation work.

  • Remediation often requires redesign, additional permitting, or specialized equipment.

  • These conditions are often missed in basic geotechnical reports.

A commercial contractor with field-tested experience will identify these risks early, recommend supplemental testing when needed, and coordinate closely with excavation teams to prevent surprises during mobilization.

2. Permitting and Utility Approvals

Permit cycles often move more slowly than construction schedules anticipate.

  • Zoning reviews, utility clearances, and agency approvals can delay start dates.

  • Resubmittals due to missing documentation or jurisdiction-specific issues add weeks.

  • In some regions, inspector availability alone causes scheduling gaps.

General contractors familiar with local regulatory agencies can anticipate approval timelines, manage documentation, and coordinate early with utilities to reduce administrative delays.

3. Design Changes and Incomplete Plans

Ongoing design decisions often stall early construction activities.

  • Incomplete civil or grading plans cause delays in excavation, utilities, and base prep.

  • Owner-driven changes during construction introduce rework and trade conflicts.

  • Uncoordinated site plans delay layout, trenching, and inspections.

Contractors who engage during design development can flag constructability issues early, coordinate across disciplines, and help ensure that field crews aren’t left waiting for decisions.

4. Labor and Trade Shortages

Skilled labor availability directly impacts progress in the field.

  • Subcontractor delays cause gaps between excavation, concrete, and framing.

  • Labor shortages in high-demand trades stretch schedules thin.

  • Crew stacking and poor sequencing slow productivity and site safety.

A strong general contractor maintains trusted trade partnerships, staggers work to prevent conflicts, and protects the schedule through realistic manpower planning.

5. Material Delays and Procurement Gaps

Supply chain issues continue to impact foundational construction materials.

  • Long-lead items like underground utilities, vaults, or specialty fittings delay trench work.

  • Reordering due to missed specs or late approvals halts progress.

  • Delivery coordination problems create idle time and staging constraints.

Construction teams that plan procurement timelines, pre-approve critical items, and coordinate deliveries in line with the build sequence keep work flowing and avoid site disruption.

6. Weather Impacts and Seasonal Timing

Construction windows are narrower than the calendar implies—especially in climates like Spokane.

  • Freeze-thaw cycles disrupt soil stability and limit concrete, compaction, and trenching.

  • Excavation work completed too late in the season may need rework after winter.

  • Moisture-sensitive soils require proactive timing to avoid saturation or frost damage.

Commercial contractors who understand regional climate windows build around them—sequencing excavation, foundation, and vertical work accordingly to avoid seasonal setbacks.

7. Coordination Breakdowns Between Stakeholders and Shifting Project Priorities

Misalignment between field teams, designers, and investors can disrupt timelines—especially when scope or financial direction changes mid-project.

  • Missing layout info, evolving site plans, or late design clarifications affect sequencing.

  • Budget changes, funding adjustments, or investor-driven scope revisions may delay procurement or rework field coordination.

  • Excavation often overlaps with multiple trades—concrete, utilities, surveying—which requires consistent communication from the start.

While not every financial disruption is within a contractor’s control, general contractors who maintain schedule clarity, document impacts, and re-sequence work efficiently help stabilize momentum when owners face funding changes or scope adjustments.

8. Inspection and Testing Delays

Even when work is completed, it cannot advance without the required inspections.

  • Footing, trench, compaction, and utility inspections often create gaps in field progress.

  • If missed or delayed, they push back follow-on trades and create idle time.

  • Limited inspector availability and inconsistent scheduling increase risk.

A general contractor who understands agency timelines and inspection protocols can proactively schedule reviews and ensure no work gets delayed waiting for sign-off.

Conclusion

Construction delays aren’t always avoidable, but many are predictable. Subsurface surprises, permitting gaps, labor shortages, and coordination breakdowns can all derail the schedule when not managed early. For developers and project owners, working with a commercial construction contractor that leads planning, sequencing, and early-phase execution is the most effective way to stay on track.

In projects where excavation plays a major role, having in-house sitework capabilities adds even more control over start dates and staging. But whether self-performing or coordinating, it’s the contractor’s ability to lead—not react—that keeps timelines intact.

Previous
Previous

Building More with Less: How Developers Are Maximizing Apartment Density Without Sacrificing Quality

Next
Next

Commercial Contractors in Spokane: Costs, Delivery, Timelines, and How to Choose